Welcome

Welcome to the website of the Ecodesign Preparatory Study on Lighting Systems (ENER Lot 37). This study will provide the European Commission with a technical, environmental and economic analysis of lighting systems as required under Article 15 of the Ecodesign Directive 2009/125/EC.

The study was carried out for the European Commission, DG Energy under specific contract N° ENER/C3/2012-418 Lot 1/06/SI2.668525, implementing framework contract ENER/C3/2012-418  Lot 1. The study team effectively started in January 2014 and was finished in December 2016.

Reports issued for this study are available on the Documents section of this website.

If you don't see changes since your last visit then refresh the browser cache by pressing:

  • Windows: ‘F5’ or ‘ctrl + F5’
  • Mac/Apple: ‘Apple + R’ or ‘command + R’
  • Linux: ‘F5’

What's new?

 

Date

Subject

February 2017

   The Study is completed (see Documents section)